Grip on budgetby financial engineering
Budget problems rarely arise in implementation
Cost overruns usually don’t occur on the construction site, but during the preliminary phase. That’s when construction cost management plays a crucial role. When design choices are made without considering costs, risks creep into the execution phase unnoticed. Those who only start managing the budget once the design is finalized have little room to make adjustments. Maintaining control over the budget therefore requires insight at the stage when decisions can still be influenced.
Math and drawing belong together
Cost database
We use an external cost database that is kept current by broad independent field research; that is the field data sourcing. That database is differentiated by building function (from simple industrial building to complex healthcare property) and by building typology (from small commercial building to stacked housing). Cost insight goes down to the line level and broken down by labor, materials and operations.
Steering for what has not yet been drawn
Decision-making based on scenarios
From grip on budget to grip on results
Anyone can design a beautiful project, but it takes skill to design a beautiful and affordable project.