Unibail-Westfield-RodamcoManagement office
Process
A special concept of architect Casper Schwarz, an in use office with multiple tenants and a very clear deadline: these are the ingredients when URW approached NewArmstrong to take on the project management for the Management office of Stadshart Amstelveen.
Office concept
The management office is the office where the day-to-day management of the shopping center resides. From technical management and facility management to commercial and financial. In this 360-square-meter office, there are 4 meeting rooms; an office space with 12 workstations, and an enclosed area for security and IT.
Budget
NewArmstrong matched a level of ambition with reference images and material selections and prepared a Foundation cost estimate for the budget based on that.
Concept
Casper Schwarz Architects created the conceptual design for this office.
The concept is based on quiet and muted colors with a preference for real materials and contrast in textures.
Because of the limited height, it was decided not to use a suspended ceiling but acoustic spray work made of recycled material.
Other acoustic measures are incorporated into furniture with a hard felt made from recycled PET bottles.
Project Management
With the design, NewArmstrong put together a technical dossier for the tender, including the technical installations. In the tender process, we have placed additional emphasis on issues that do not directly affect supplies but strongly influence pricing, such as
- the limited hours of operation due to the residences and stores in the property
- the limitations in transportation of demolition waste ( no possibility of placing a container
- the limited loading and unloading possibilities on the Rembrandthof in connection with the market on disnbday and Friday
- the timeline of moving tenants and terminating leases making deadlines very strict
With the technical file, we handled the tendering, awarding, contract formation and project management during execution.
The bids between them had a deviation of a few percent of the contract price and were in line with the budget. This is always an indication to us that the call for tender is complete and the right level of quality has been requested.
With a contract based on UAV with restrictive conditions, the contract was awarded and executed.
A 3-month time block was available between award and delivery, and the project was delivered within this time frame.
.
interesting facts
Surface
Workplaces
floors
Related projects
Want your Business to Take Off?Feel free to contact us.
Justus Slaakweg
Leidsevaartweg 1
2106 NA Heemstede
+31 88 007 2600